Grading Drainage And Pavement

The Department of the Army, Installation Management Command has a requirement for grading, drainage and pavement
construction, maintenance, and repairs postwide in Fort Novosel, Alabama.

Solicitation Summary

The Department of the Army, Installation Management Command has a requirement for grading, drainage and pavement
construction, maintenance, and repairs postwide in Fort Novosel, Alabama.

Solicitation in a Nutshell

Item

Details

Agency Department of the Army, Installation Management Command
Solicitation Number W911S025BA0001
Status Post-RFP
Solicitation Date 02/07/2025
Award Date 03/2025 (Estimate)
Contract Ceiling Value $29,500,000
Competition Type  Full and Open / Unrestricted
Type of Award  IDIQ – Agency Specific
Primary Requirement Other Construction Services
Duration 1 year(s) base plus 4 x 1 year(s) option(s)
Contract Type  Firm Fixed Price,Indefinite Delivery Indefinite Quantity
No. of Expected Awards N/A
NAICS Code(s):
237310

Highway, Street, and Bridge Construction
Size Standard: $45.0 million annual receipts

Place of Performance:
  • Alabama, United States
    • Fort Novosel
Opportunity Website: https://sam.gov/opp/d8a60717a6254de48523ad82e209e7ff/view

Background

N/A

Requirements

  • Contractor shall perform all operations in connection with the grading, drainage, and paving required to construct, repair and maintain roads and parking lots at various locations on Fort Novosel property as directed by the Directorate of Public Works (DPW).  This work is governed by the applicable drawings and these specifications are subject to the terms and conditions of the contract.  Drawings of the areas to be paved will be submitted to the Contractor with individual task orders as required.  All drawings provided to the Contractor are for reference/information only and may or may not be current or to scale. The Contractor shall provide any/all deviations to accepted local, state, and federal building practices/codes to the attention of the Construction Inspector and Contracting Officers Representative for review/consideration by the government.
  • The Contractor shall be responsible for obtaining utility spotting/location and permits that may be required by Environmental Considerations FB-144R. If any work done by the contractor is not according to specifications listed below, that work will be re-done per specs.  The re-work will be done at the contractor’s expense.  General survey and layout requirements for existing roadways overlays, roadway widening, drainage structures and parking lot overlays shall be part of contractors bid.  Where layout and engineering work will be required for establishing new roadway, parking lots and site work the contractor and government representative will reach an agreed time frame during the scoping of project.  This cost will be covered by the Field Engineering and Layout bid item shown on bid schedule.  When required, the Contractor is to provide the necessary documentation in order to obtain a NPDES permit for the new construction.  When all work is complete, the Contractor will be required to provide the DPW with a complete set of As-Built drawings (both electronic and hard copy).

How can GDIC Help?

As a consulting firm that specializes in helping companies prepare winning proposals for government contracts, GDIC can provide a wide range of services to help offerors prepare their C2E proposal, including capture management, proposal writing, proposal management, and proposal review. GDIC can also provide training and support to help offerors understand the technical and administrative requirements outlined in the solicitation, and can provide guidance on how to structure the proposal to maximize its chances of success.

Our business development and proposal professionals have several decades of experience and expertise in construction proposals and contracts for government. By working with GDIC, offerors can increase their chances of winning the C2E contract and can position themselves for long-term success in the federal marketplace.