Dam Turbine Runner Replacement

The Department of the Army, US Army Corps of Engineers, Portland District has a requirement for the rehabilitation of up to sixteen turbine generator units at John Day Lock and Dam.

Solicitation Summary

The Department of the Army, US Army Corps of Engineers, Portland District has a requirement for the rehabilitation of up to sixteen turbine generator units at John Day Lock and Dam.

Solicitation in a Nutshell

Item

Details

Agency Department of the Army, US Army Corps of Engineers, Portland District
Solicitation Number W9127N24R0001
Status Pre-RFP
Solicitation Date 03/2025 (Estimate)
Award Date 06/2025 (Estimate)
Contract Ceiling Value $500,000,000
Competition Type  Full and Open / Unrestricted
Type of Award Other
Primary Requirement Other Construction Services
Duration  see OPI
Contract Type Fixed Price with Economic Price Adjustment
No. of Expected Awards N/A
NAICS Code(s):
237990

Other Heavy and Civil Engineering Construction
Size Standard: $45.0 million annual receipts except $37.0 million annual receipts for Dredging and Surface Cleanup Activities

Place of Performance:
  • Rufus, Oregon, United States
    • John Day Lock and Dam,
Opportunity Website: https://sam.gov/opp/e2002ed5a13a4dbab8fd4f8ab22d37e8/view

Dam Turbine Runner Replacement Background

N/A

Dam Turbine Runner Replacement Requirements

  • The goals of the project are to address decreasing reliability and efficiency of the hydroelectric generating units and to maximize the net economic benefits over the next several decades, while maintaining an acceptable level of operational flexibility, all within the hydraulic and environmental constraints imposed on the project. Economic benefits will be realized through increasing reliability and efficiency of the hydroelectric generating units after replacing existing turbines with improved fish passage turbines that provide improved power generating efficiency, rewinding the generators, and replacing and refurbishing other powertrain equipment. The design of the state-of-the-art turbines will be an iterative and collaborative process that focuses on improved fish passage design features and criteria to improve survival of turbine-passed fish. Finally, this project will decrease the risk of oil entering the water passageway and river through improved sealing technologies, design considerations for new adjustable-blade turbine runners, and the introduction of some fixed-blade turbine runners.

How can GDIC Help?

As a consulting firm that specializes in helping companies prepare winning proposals for government contracts, GDIC can provide a wide range of services to help offerors prepare their C2E proposal, including capture management, proposal writing, proposal management, and proposal review. GDIC can also provide training and support to help offerors understand the technical and administrative requirements outlined in the solicitation, and can provide guidance on how to structure the proposal to maximize its chances of success.

Our business development and proposal professionals have several decades of experience and expertise in construction proposals and contracts for government. By working with GDIC, offerors can increase their chances of winning the C2E contract and can position themselves for long-term success in the federal marketplace.