B21 Environmental Protection

The Department of the Army, Army Corps of Engineers (USACE), Omaha District has a requirement for B-21 Environmental Protection Shelters at Ellsworth AFB, SD.

Solicitation Summary

The Department of the Army, Army Corps of Engineers (USACE), Omaha District has a requirement for B-21 Environmental Protection Shelters at Ellsworth AFB, SD.

Solicitation in a Nutshell

Item

Details

Agency Department of the Army, Army Corps of Engineers (USACE), Omaha District
Solicitation Number W9128F25R0011
Status Post-RFP
Solicitation Date 01/03/2025
Award Date 06/2025 (Estimate)
Contract Ceiling Value $100,000,000
Competition Type  Full and Open / Unrestricted
Type of Award Other
Primary Requirement Architecture Engineering and Construction
Duration 730 Days
Contract Type  Firm Fixed Price
No. of Expected Awards N/A
NAICS Code(s):
236220

Commercial and Institutional Building Construction
Size Standard: $45.0 million annual receipts

Place of Performance:
  • Ellsworth Air Force Base, South Dakota, United States
Opportunity Website: https://sam.gov/opp/e45e12696be149e19a3825e8ad734859/view

B21 Environmental Protection Background

N/A

B21 Environmental Protection Requirements

  • This project will provide six (6) new pre-engineered metal Environmental Protection Shelters (EPS), approximately 20,000 SF each.  EPS’s are sized to fit the B-2A “Spirit” aircraft with space to perform general aircraft maintenance.  The project also includes associated airfield and ground support equipment (GSE) paving.  Supporting facilities include three (3) maintenance kiosks, approximately 160 SF each, providing electrical and communication infrastructure to the EPS’s.  This project will include a space or spaces constructed to AFI 16-1404 requirements. Additionally, this project will full demolition of existing facilities and partial demotion of Dock 83 and reconstruction of the exterior metal wall of Dock 83.
  • The project will be constructed near Row 80 of flightline facilities at EAFB. As such, the project will be constructed adjacent to – and may be required to integrate with active airfield operations. It will also be constructed adjacent to other active B-21 facility construction sites. Demolition of existing utilities and infrastructure – to include hazardous materials contaminated apron and soils may be required. New airfield apron will be designed in compliance with UFC 3-260-02 and will be constructed in compliance with UFGS 32 13 14.13.

How can GDIC Help?

As a consulting firm that specializes in helping companies prepare winning proposals for government contracts, GDIC can provide a wide range of services to help offerors prepare their C2E proposal, including capture management, proposal writing, proposal management, and proposal review. GDIC can also provide training and support to help offerors understand the technical and administrative requirements outlined in the solicitation, and can provide guidance on how to structure the proposal to maximize its chances of success.

Our business development and proposal professionals have several decades of experience and expertise in construction proposals and contracts for government. By working with GDIC, offerors can increase their chances of winning the C2E contract and can position themselves for long-term success in the federal marketplace.